17
FERRITE BEAD INSTALLATION
When using either of the options below, to reduce the risk of radio interference, fit
the ferrite assemblies supplied with the UPS as follows:
Serial Communications
Attach the smaller enclosed ferrite
bead clamp to the communication
cable as shown in the drawing using
the following directions:
• Open the ferrite bead.
• Place the communication cable
inside the ferrite bead groove.
• Position the ferrite beads as close
as possible to the end of the
cable that connects to the DB9
connector of the UPS.
• Close the ferrite bead so that the
ferrite bead’s case snaps closed
with the cable routed inside the
ferrite bead’s case.
SNMP Installation ( When fitted)
Attach the larger enclosed ferrite bead
clamp to the network cable as shown
in the drawing using the following
directions:
• Open the ferrite bead.
• Place the network cable inside the
ferrite bead groove.
• Wrap the cable once around the
bead.
• Position the ferrite cable as close
as possible to the end of the cable
that connects to the UPS.
• Close the ferrite bead so that
the ferrite bead’s case snaps
closed with the cable routed
inside the ferrite bead’s case.