MGE UPS Systems STS 200A Switch User Manual


 
Installation and User Manual
Figure QS-4 400/600A STS Input/Output Power Connections.
Step 4 Arrival of MGE Field Engineer
The MGE Field Engineer will finalize
the initial Epsilon STS™ start-up. To insure a successful installation
and
reliable STS service, the MGE Field Engineer will verify all of the installation connections, fusing, and then will
examine the extensive set of
Epsilon STS™
personalization parameters to insure that the operation of the STS
exactly matches your installation requirements.