Nortel Networks 2300 Series Switch User Manual


 
17
Nortel WLAN - Security Switch 2300 Series Quick Start Guide
Installing a new power supply
Estimated timing: 5 minutes
Some WSS models support secondary power supplies. To install a secondary power supply, complete the following
steps:
Step Action
1 Loosen the thumbscrew in an unused slot with a #2 Phillips-head screwdriver, and
remove the cover plate.
2 Remove the new power supply from its packaging and lift the supply by grasping the
front handle with one hand and supporting the supply from the bottom with the other
hand.
3 Insert the power supply into the slot as shown in Figure 3, pushing gently but firmly until
the supply is fully seated and flush with the switch’s front panel.
Figure 3: Inserting a Power Supply in a 2380 Switch
4 Tighten the thumbscrew using a #2 Phillips-head screwdriver.
End
Powering on the Nortel WLAN Security Switch
Estimated timing: 5 minutes
Powering on a 2350
Step Action
1 Plug the external power supply input AC cord into an AC power source.
2 Attach the external power supply DC output cable to the Power port on the 2350.
The 2350 begins booting as soon as you plug in the power cord.
3 Ensure that the external power supply LED and the 2350 power LED turn green to
verify that the external power supply is operating normally.
End
840-9502-0060