Panasonic CF-T4HWETZBM Personal Computer User Manual


 
2. Attachment preparation of Key Board
2-1. Putting of Heat Sheet KB Large
Touch the KB hole
Touch the KB hole
Inclination is set
to 0.5mm or less.
Inclination is set
to 0.5mm or less.
2-2. Putting of tape
0 1mm
0 1mm
8 1mm
0.5 1.5mm
0.5 1.5mm
Tape(KBD)
KeyBoard exterior and FPC are parallel.
(KBD)
0 0.5mm
3. Screw tightening of bottom case (1)
The keyboard is inserted, and after the keyboard hooks are inserted in order of a and b while holding the keyboard, the screw
tightening is done in the following order.
Note:The sheet metal must not run aground on the rib (Refer to the figure below).
2-1. DXHM0039ZA(D:N5) is tightened. No.1 to No.7
2-2. DXHM0057ZA(G:N7) is tightened. No.8 to No.12
Keyboard
Hook
Top Case
Top Case Rib
OK
NG
Assembly reference chart
Screw(G)
Screw(G)
Screw(D)
Screw(D)
Screw(D)
Screw(D)
Screw(G)
Screw(G)
Screw(G)
Screw(D)
Screw(D)
Screw(D)
Keyboard Hook a
Keyboard Hook b
41