Polycom 1725-36032-001 Server User Manual


 
PN: 1725-36032-001_G.doc
15
Installing the Spectralink 8000
SVP Server
As shown in the system diagram the SVP Server is connected to the
Ethernet switch. The specifications covered here allow for great
flexibility in physical placement of the components within stated
guidelines.
This unit must be installed by a service person familiar with the
installation of electronic equipment.
Do not power up the unit before it has been properly grounded to a
protective earth. See Grounding Instructions below.
Required Materials
The following equipment must be provided by the customer.
Power Outlet – AC adapter provided by Polycom
Backboard space – The SVP Server is designed to be wall-
mounted to 3/4" plywood securely screwed to the wall.
Screws – Required to mount the SVP Server to the wall. Four #8
3/4" panhead wood screws (or similar device) are required.
Cat. 5 Cable – RJ-45 connector at the SVP Server. Connection to
Ethernet switch.
Grounding materials per section below Grounding Instructions.
Locate the SVP Server
The SVP Server measures approximately 4 x 12.5 x 7 inches, and
weighs about five pounds. The unit can be wall mounted, vertically or
horizontally, over ¾" plywood. The SVP Server can also be rack
mounted using a rack mount kit (sold separately).
2