SpectraLink 8000 SVP Server: Administration Guide for SRP
PN: 1725-36032-001_G.doc
18
Use only the provided Class II AC Adapter with output 24VDC, 1A.
2. Plug the AC adapter into an 110VAC outlet to apply power to the
SVP Server.
3. Verify that leakage current ("touch" current) is below 250 μA rms
on exposed metal surfaces.
4. If leakage is excessive, power off the system and re-verify ground
path continuity.
5. The system will cycle through diagnostic testing and the LEDs
will blink for about one minute. When the system is ready for use:
— The ERROR LED should be off.
— Status 1 should be blinking.