KIRK Wireless Server 1500 Installation and Maintenance
6. Connect the cable to the Base Station. It is important to mount the Base Station with
the antennas facing out and right-side up.
Holes for wall mounted screws
Connection to server
7. The last step is to perform a cable delay measurement using the KWS1500
Administration Software.
The Cable Delay Measurement feature can be found on the Base Station Status tab
located in the Preferences screen. The Preferences option is located in the Options
menu. See
KIRK Wireless Server 1500 Administration Program Software Guide
,
Section 4.4
Options – Preferences – Base Station Status
.
Mounting KIRK Repeaters
It is advisable to use the KIRK Service Tool software and configure the Repeater before
mounting.. Before beginning the installation, determine the position of the repeater for
best coverage. The coverage depends on the construction of the building, architecture,
and the choice of building materials.
The repeater does not add channels, it only adds additional coverage area.
The repeater can be registered to the solution 1) when placed within the
coverage area of a base station, 2) when placed within the coverage area of an
already installed repeater or 3) when placed outside the coverage area using
an external antenna.
The repeater must not be installed at any angle other than vertical. If the
repeater is placed upside-down, the coverage area of the repeater is
decreased by 40 – 50%, and it might not transmit or receive effectively.
72160400_issue_B 38