Powerware Powerware 5119 Network Card User Manual


 
UPS Maintenance
23
Powerware
®
5119 User’s Guide www.powerware.com
4. Remove the old battery. See “Recycling the Batteries” on
page 24 for proper disposal.
5. Connect the new batteries to the UPS as shown in Figure 16
and reinstall.
1000 VA Models
Black Cable from UPS
Positive Terminal
Red Cable from UPS
Negative Terminal
1500 VA Models
Red Connector
from UPS
Black Cable from UPS
Negative
Terminal
(Black)
Red Battery Connector
Figure 16. Internal Battery Connections
Testing New Batteries
Press and hold the button for three seconds to initiate a self-test.
After the test is finished, the red Battery Service indicator should turn
off and the Battery Charge LEDs should show a charge. If the Battery
Service indicator stays on, check the battery connections. See the
troubleshooting guide on page 33 or call your service representative if
the problem persists.