Princeton 1300 Projector User Manual


 
23
Chapter 3
Installation Overview
The list and diagrams below briefly describe the sequence of actions required to
hookup your system and prepare to gather data. Refer to the indicated references
for more detailed information. This list assumes that the application software is
Princeton Instruments WinView/32.
Action
Reference
1. If the system components have not already been unpacked, unpack
them and inspect their carton(s) and the system components for in-
transit damage. Store the packing materials.
Chapter 4 System Setup,
page 25
2. Verify that all system components have been received.
Chapter 4 System Setup,
page 25
3. If the components show no signs of damage, verify that the
appropriate voltage settings have been selected for the Controller.
Chapter 4 System Setup,
page 28
4. If the WinView/32 software is not already installed in the host
computer, install it. This will install the appropriate drivers for the
interface card.
WinView/32 manual
5. If the appropriate interface card is not already installed in the host
computer, install it.
Chapter 4 System Setup,
PCI Interface, page 31 or
USB 2.0 Interface, page 32
6. With the Controller and computer power turned OFF, connect the
interface cable (TAXI or USB) to the Controller and the interface
card in the host computer. Then tighten down the locking hardware.
Chapter 4 System Setup,
page 35
7. With the Controller power turned OFF, connect the Detector-Controller
cable to the appropriate connector on the rear of the Controller and the
other end to the appropriate connector on the rear of the Camera.
Adjust the slide latches so the cable connections are locked.
Chapter 4 System Setup,
page 35
Chapter 7, Troubleshooting,
page 82
8. With the Controller power turned OFF, connect the Controller
power cable to the rear of the controller and to the power source.
9. If the camera has water-assisted cooling or is water-cooled, make the
tubing connections between the circulator and the camera. Fill the
circulator with the required mixture, turn on the circulator, turn on
the refrigeration, and set the coolant temperature.
Chapter 4 System Setup,
page 37
Chapter 5 Operation,
page 43
10. Turn the Controller ON.