SharkRack 37U Computer Hardware User Manual


 
SharkRack Enclosure Installation Guide
ID-00210-000 REV D, ECO2773 Page 12 of 46
Unpacking Instructions- Integration Packaging
Step Detail
WARNING: A fully loaded cabinet is very
heavy. Take proper precautions when moving
the cabinet
Note: Unpacking of a cabinet requires at least two
people.
There must be at least 13 feet of clear area in front of
the loaded crate to unload the cabinet.
1. Open the Crate. Loosen the (6) clips securing the
front of the crate. The front of the crate is used as a
ramp to unload the cabinet.
Figure 9
Shipping Crate Shown for 42U X 37DP Cabinet
2. Position the loading ramp onto the front of the crate.
3. Remove the (2) wing nuts securing the piece of wood
at the base of the cabinet.
4. Remove the (4) bolts securing the front Floor
Mounting Bracket to the crate and cabinet.
Figure 10
Shipping Crate with 42U X 37DP Cabinet Shown
#3
#4