Sun Microsystems 6000 Network Card User Manual


 
Powering Off and On 12-9
12
Note POST does not test drives or internal parts of SBus cards. To test these
devices, run OBP diagnostics manually after the system has booted. Refer to
the OpenBoot Command Reference manual for instructions.
7. To start POST again, or if the system hangs, press the CPU reset switch on
the clock board.
See Figure 12-7.
Figure 12-7 CPU Reset Switch on Clock Board
8. If the system displays “not responding” or “no carrier” messages, the
Link Integrity Test may be set incorrectly. See “Link Integrity Test” on
page 4-24.
System
reset switch
CPU
reset switch