MA7200 PLUS Inverter 1 to 2 HP PID Fan and Pump Quick Start Manual
__________________________________________________________________
________________________________________________________________
TECO – Westinghouse Motor Company
21
Step 13
– Testing The System
• The system can now be tested for performance. To do this, set the set-point through the
keypad and run the drive at some low level and check that the motor is operating properly
and that the feedback signal level and polarity are correct.
• Check the system for dynamic operation and make any adjustments necessary for optimum
performance. This may require making adjustments to parameters Bn-17 proportional
gain and Bn-18 Integral Time. (Refer to Step 10)
NOTE: Parameters Bn-17 and Bn-18 may be changed through the keypad while the
system is operating.
A word of CAUTION ! - the parameter changes should be made in small increments
and the results checked to avoid highly unstable and possibly damaging
conditions.
• This should complete the installation.
MA7200 PLUS BLOCK DIAGRAM
Fig. 5 is an overall basic electrical connection diagram for the MA7200 PLUS. It is used in
conjunction with the other sections of this guide to give the user the ability to successfully start up
a fan or pump application. More detailed information is available in the MA7200 PLUS Manual to
which the user is referred, if further information is required.