Release 1.0 13
Section 2. Installation and Configuration
Introduction
We usually install the APG interface in a power supply at the factory. Your local
distributor or service center can also install the interface, especially for use in a
previously-purchased supply already on site.
Initial Inspection
On first receiving your unit, perform a quick physical check.
• Ensure each package contains a power supply with its APG interface board
installed, and manuals for the power supply and the APG interface. Any
additional parts shipped with the power supply will be identified in the supply's
documentation.
• Inspect the unit for any signs of physical damage such as scratches, cracks, or
broken switches, connectors, or displays.
• Check the printed circuit board and components if you suspect internal damage.
If the unit is damaged, save all packing materials and notify the carrier immediately.
For additional information, please see the section titled, “Returning Power Supplies
to the Manufacturer” in the manual shipped with your complete unit.
!
CAUTION
If you remove the unit's cover, use proper static control techniques to avoid damage
to static-sensitive components on the printed circuit board.
!
CAUTION
Use proper static control techniques to avoid damage to static-sensitive components
on the printed circuit board.