Installation
3–4 152315 Rev C
Removing the Pallet and Moving the PV100S
To move the PV100S using a forklift:
1. Place the forks of the forklift below the unit at the points specified in
Figure 3-2.
2. Lift the PV100S from beneath the respective enclosures.
Be sure to use a forklift with a 26" fork span.
3. Remove the pallet from beneath the unit.
4. Once the pallets are removed from the units, use the same lifting locations to
lift the units into the place where they are to be permanently located.
c
CAUTION: Equipment Damage
To move the PV100S, use a forklift that has a sufficient lift capacity and a 26" fork span.
Figure 3-2
Forklift Lifting Locations - Underneath Unit
0
I
^
F2654
32
.
-
1
0
F3MENU
F4ENTER
987 F1
^
DISCO N NE CT
PV
Inverter
Enclosure
Inductor
Enclosure
Communications
Enclosure
Transformer
Enclosure
AC
Interface
Enclosure
DC Interface
Enclosure
Lift Here
Lift Here
26" (66 cm)
fork span
26" (66 cm)
fork span