Zebra Technologies P330i Printer User Manual


 
12 P330i User’s Manual 980459-001 Rev. A
Installation and Setup
Loading a Ribbon
3. Locate the Ribbon Supply Spindle and the Ribbon Take-up Spindle (see above). Load
ribbon onto the supply spindle (under the print head carriage) flange side in, and load the
empty core (with tape attached) onto the take-up spindle. Make sure the ribbon comes off
the top of the supply spindle and feeds to the top of the take-up spindle.
Ribbon Supply
Spindle
Ribbon Take-up
Spindle
Flange
Supply Spool
Take-up
Spool