2.6.1 Pouring a Concrete Pad
Prepare a base for the concrete pad that meets all local code requirements. The base must have a
footing of 4 to 6 inches (10.2 to 15.2 cm) of sand or gravel on firmly compacted soil. Concrete
pad height is site and climate dependent. Height should be based on keeping the front door air
intake louvers and rear bottom exhaust vent free of obstruction. For dimensions of pad, refer to
Figure 28.
Figure 28. Concrete Pad Dimensions
2.6.2 Mounting the Cabinet on a Concrete Pad
Use the following procedure to mount the cabinet on the concrete pad.
1. Fasten the pedestal mounts to the concrete pad using the customer-supplied hardware
identified in Figure 29.
15.38 IN.
(39.07 CM)
4.3 IN.
(10.9 CM)
29.00 IN.
(73.66 CM)
HOLES FOR
PEDESTAL
MOUNT
24.0 IN.
(61 CM)
3.5 IN.
(8.9 CM)
36.0 IN.
(91 CM)
31.0 IN.
(79 CM)
CONCRETE PAD
(MINIMUM SIZE)
RAN CABINET/
PEDESTAL ENCLOSURE
FOOT PRINT
DOOR
CLEARANCE
92.0 IN.
(234 CM)
21308-A