2.12 Installation Checklist
-All packing materials a nd restraints have been removed from each cabinet.
-Each cabinet in the Parallel Capacity/Redundant system is placed in i ts installed
location.
-A ground bond is installed between any cabinets that are bolted together.
-All switchboards, conduits, and cables are properly routed t o the SSBM, UPMs and
auxiliary cabinets.
-All power cables are properly terminated.
-A ground conductor is properly installed.
-If neutral connection is used, no other N---G bonds exist downstream from the UPMs.
-Battery cables and harness are terminated on E4 and E5.
-Internal battery cabinet connections have been completed (bus bars, plugs, etc.).
-Shunt trip signal wiring is connected from UPMs to battery breaker(s).
-Air conditioning equipment is installed and operating correctly.
-The area around the installed Parallel Capacity/Redundant system is clean and
dust-free. (It is recommended that the Parallel Capacity/Redundant system be
installed on a sealed concrete pad or a sealed concrete floor.)
-Adequate work space exists around the SSBM, UPMs and other cabinets.
-Adequate lighting is provided around the P arallel Capacity/Redundant system.
-A 120VAC service outlet is located within 25 feet of the Parallel Capacity /Redundant
system.
-All circuit breaker trip units settings have been completed per the user’s coordination
study.
-Each Remote Monitor Panel (RMP) is mounted in its installed location. (OPTIONAL)
-The control wiring for each RMP is terminated inside the UPS cabinet. (OPTIONAL)
-The Remote Emergency Power Off (EPO) device is mounted in its installed location
and its wiring terminated inside the SSBM. (OPTIONAL)
-Summary alarms and/or building alarms are wired appropriately. (OPTIONAL)
-A Relay I nterface Module (RIM) is mounted in its installed location a nd its wiring is
terminated inside the SSBM. (OPTIONAL)
-A remote battery disconnect control is mounted in its i nstalled location and its wiring is
terminated inside the UPS and battery cabinet. (OPTIONAL)
-Startup and operational checks performed by authorized service personnel.