
6-- 3
Powerware 9315 Parallel Capacity/Redundant System with PHP SSBM
164201373 Rev. A 092402
4. Connect the SCM wiring to the terminal block using the terminations shown in
Table 6 --- 1.
Table 6---1. Supervisory Contact Module Wire Terminations
From SCM A To SSBM Remarks
TB1 --- 4
TB3 --- 1
TB1 --- 5
TB3 --- 2
TWISTED WIRES (4)
TB1 --- 6
TB3 --- 3
---
3INCHES
TB1 --- 7
TB3 --- 4
From SCM B (if used) To SSBM Remarks
TB1 --- 4
TB3 --- 5
TB1 --- 5
TB3 --- 6
TWISTED WIRES (4)
TB1 --- 6
TB3 --- 7
---
3INCHES
TB1 --- 7
TB3 --- 8
5. Contact your local field s ervice office for verification and testing of the SCM
and its co nnections prior to making connections to terminal strip TB2 shown
in Figures 6 --- 1 and 6 --- 3.
6. Repeatsteps1through5foreachSCMyouareinstalling.
7. If you are installing an RMP or RIM in addition to an SCM, proceed to
Chapter 4 or 5, respectively; otherwise, secure the SSBM by reversing the
steps contained in procedure “To Prepare t he SSBM for Wiring to an RMP,
RIM, SCM, o r Remote EPO” of Chapter 2.