Reinstalling the Cover 3-3
Reinstalling the
Cover
1 Reinstall the cover on the SuperStack II bridge/router and reattach it to
the chassis with the two screws.
2 Place the upgrade sticker included in your kit on the chassis, as shown.
If you have both the flash memory and the DRAM memory upgrade
kits, place one sticker from each kit as shown.
3 Plug the power cord back into the bridge/router. If available, plug the
RPS cable into the bridge/router.
4 Turn on the bridge/router.
Place upgrade sticker in either or both locations
MODEL: ESPL-310
REMOTE OFFICE
NETBUILDER
222
S/N:
1SC05427
100-240VAC, 50/60HZ, 1.0-0.5A
250V, F2A
8.3
FOR CONTINUED PROTECTION
AGAINST FIRE HAZARD
REPLACE FUSE ONY WITH
SAME TYPE AND RATING
NTWK
ADDR:
3COM CORP.
SANTA CLARA, CA. MADE IN USA
080002 04BA1E LAN
04BA1F
04BA20
04BA21
WAN-A
WAN-B
WAN-C
20-0261-000
07/31/95
SS2TRHWBook Page 3 Monday, May 5, 1997 3:11 PM