8e6 Technologies ERH-200 (5K02-24) Network Card User Manual


 
8e6 enterprise reporter Quick start Guide 15
Install the Server into the Rack
You should now have rails attached to both the chassis and the rack unit. The next step
is to install the server chassis into the rack. Do this by lining up the rear of the chassis
rails with the front of the rack rails. Slide the chassis rails into the rack rails, keeping the
pressure even on both sides (you may have to depress the locking tabs when inserting).
When the server has been pushed completely into the rack, you should hear the locking
tabs “click.” Finish by inserting and tightening the thumbscrews that hold the front of the
server to the rack.