Allied Telesis 8PS Switch User Manual


 
31
Chapter 2
Installation
This chapter contains the following sections:
“Reviewing Safety Precautions” on page 32
“Selecting a Site for the Switch” on page 34
“Unpacking the Switch” on page 35
“Installing the Switch on a Desktop” on page 37
“Installing the Switch in an Equipment Rack” on page 38
“Installing the Switch on a Wall” on page 40
“Installing Optional SFP Transceiver” on page 43
“Cabling the Switch” on page 45
“Powering On the Switch” on page 46