Allied Telesis 8PS Switch User Manual


 
AT-GS900/8PS Switch Installation Guide
39
Figure 7. Mounting the Switch in an Equipment Rack
4. Go to “Installing Optional SFP Transceiver” on page 43 or “Cabling the
Switch” on page 45.