Allied Telesis AT-SBX31FAN Switch User Manual


 
45
Chapter 2
Installation
This chapter describes how to install the SwitchBlade x3112 in an
equipment rack. This chapter contains the following sections:
“Reviewing Safety Precautions” on page 46
“Selecting a Site for the SwitchBlade x3112” on page 49
“Installing the AT-SBx3112 Chassis” on page 50
“Protection Against Electrostatic Discharge (ESD)” on page 60
“Installing the AT-SBx3161 System Power Supply” on page 61
“Installing the AT-SBx3165 PoE Power Supply” on page 65
“Installing the AT-SBx31CFC Fabric Control Card” on page 68
“Installing the AT-SBx31GP24 PoE Line Card” on page 72
“Installing the AT-SBx31XZ4 XFP Line Card” on page 75
“Replacing the AT-SBx31FAN Tray” on page 79
“Cabling the Twisted-Pair or Fiber Optic Ports” on page 82
“Installing the Chassis Blank Panels” on page 83
“Applying A/C Power to the SwitchBlade x3112” on page 84
“Starting a Local Management Session” on page 87