AT-FS750/24POE Fast Ethernet Smart Switch Installation Guide
47
Figure 16. Plugging in the AC Power Cord
2. Plug the other end of the power cord into a wall outlet.
3. Verify that the POWER LED is green. If the LED is OFF, refer to
Chapter 3, “Troubleshooting” on page 49.
The switch is now powered on and ready for network operations. To
start a management session on the switch, refer to “Starting a
Management Session” on page 48. session, refer to the AT-S88
Management Software User’s Guide.
Warning: Power cord is used as a disconnection device. To de-
energize equipment, disconnect the power cord.
E3
Pluggable Equipment. The socket outlet shall be installed near
the equipment and shall be easily accessible.
E5
1104