Rack Assembly
24 Battery Rack Assembly and Installation Manual
5. Remove protective boot and connect this same cable end to the open positive (+) terminal on the
first battery in the lower shelf. Snap cable boot over connected lug/terminal.
Assembling the second rack
The battery racks must be deployed in multiples of two.
Repeat all previous steps to assemble, load, and wire the second battery rack.
The first rack (Rack #1) contains the BAT 1 string (batteries #1-32), and the second rack
(Rack #2) contains the BAT 2 string (batteries #33-64).
Top Shelf
2nd Shelf
Shelf-to-shelf Wiring
1
2
3
4
8
7
6
5
12
11
10
9
13
14
15
16