American Power Conversion MW Power Supply User Manual


 
Symmetra MW 1000 kW 480 V Installation - 990-4112E 9
To p Ca bl e En tr y
Preparing for top cable entry (default)
Cable entry in top cover of Input/Output Section.
Loosen the 8 bolts in cable entry covers. Drill holes for conduits in areas shown. Re-fit the
covers and install the conduits.
Install cable lugs on busbars. Use M12 bolts.
L2 IN
L1 IN
L3 IN
L1 OUT
L2 OUT
L3 OUT
AC IN AC OUT
BAT 1 BAT 2
92 93
95
90
91 94
L3 OUT
L2 OUT
92 93
90
91 94
95
L1 OUT
L3 IN
L2 IN
L1 IN
2.3 in / 58 mm
1.75 in /
44.45 mm
1.75 in /
44.45 mm
IN/OUT power cable (top entry)
AC IN cable
entry
AC OUT
cable entry
Battery
cable
entry
Battery
cable
entry
Top view
M6 Bolt
Top view