American Power Conversion MW Power Supply User Manual


 
Electrical Installation: Bottom Cable Entry
Symmetra MW 1000 kW 480 V Installation - 990-4112E 17
Ground and AC cable connections (bottom cable entry)
Feed the AC and ground cables through the bottom of Input/Output Section as illustrated.
Connect cables as illustrated.
Equipment grounding cables
for Battery 1 & AC IN
Equipment grounding cables
for Battery 2 & AC OUT
Battery 2
Battery 1
Output circuit
grounding bar
Midpoint bonding jumper
Equipment grounding bar
2.3 in / 58 mm
1.75 in /
44.45 mm
1.75 in /
44.45 mm