American Power Conversion MW Power Supply User Manual


 
Electrical Installation: Top Cable Entry
12 Symmetra MW 1000 kW 480 V Installation - 990-4112E
Ground and AC cable connections (top cable entry)
Feed the AC and ground cables through the top of Input/Output Section as illustrated.
Connect the cables as illustrated.
2.3 in / 58 mm
1.75 in /
44.45 mm
1.75 in /
44.45 mm
Midpoint bonding jumper
Grounding electrode
conductors (red) for
Battery 1 & AC IN
Equipment grounding
cables for Battery 2
and AC Out
Output circuit
grounding bar