American Power Conversion 10-30 KVA Power Supply User Manual


 
990-2359A Smart-UPS® VT 10-30kVA, 200/208V and XR Battery Enclosure Operation Guide 23
Restart Procedure
Power application
Set the utility breaker to the ON position.
If your installation includes an XR Battery Enclosure with a DC disconnect switch, set the DC
disconnect switch to the ON position.
After system boot-up, the display will automatically prompt you on how to confirm/select voltage
and frequency as shown in the following.
WARNING!
Only trained personnel familiar with the construction and the equipment may carry out
the Start-Up procedure.
NOTE!
Wait approximately 30 seconds for the system to boot up and carry out self test.
XR Battery Enclosure
Utility
breaker
UPS