American Power Conversion 10-30 KVA Power Supply User Manual


 
Operation – Battery Replacement
990-2359A Smart-UPS® VT 10-30kVA, 200/208V and XR Battery Enclosure Operation Guide 31
Install the Battery Modules in the lowest available bay (4 across in 523mm UPS versions, 2
across in 352mm UPS versions).
Position the Battery Unit to slide in between the grooves and push completely into the UPS to
ensure connection.
NOTE!
If a problem is reported, ensure that the modules in question are correctly installed. If the
problem persists, refer to the Troubleshooting section of this guide.
NOTE!
Allow for a 24-hour recharging period of the batteries after system start-up / battery
replacement for battery monitoring data to become fully reliable.
UPS / XR