Symmetra MW 800 kW 3 × 400/230 V Installation - 990-1510D 9
To p C a bl e E n t r y
Preparing for top cable entry (Default)
Cable entry in Top Cover of Input/Output Section.
Loosen the 8 bolts in both cable entry covers (4 bolts in each cover). Drill holes for the
grommets in areas shown. Install the grommets and re-fit the covers.
Install cable lugs on busbars. Use M12 bolts. Feed cables through the top grommets.
Connect L1, L2 and L3 to busbars where indicated.
NN
L2 IN
L1 IN
L3 IN
L1 OUT
L2 OUT
L3 OUT
AC IN AC OUT
BAT 1 BAT 2
92 93
95
90
91 94
L3 OUT
L2 OUT
92 93
90
91 94
95
L1 OUT
L3 IN
L2 IN
L1 IN
2.3 in / 58 mm
1.75 in /
44.45 mm
1.75 in /
44.45 mm
IN/OUT power cable (top entry)
AC IN cable
entry
AC OUT
cable entry
DC
cable
entry
DC
cable
entry
Top view
M6 Bolt