Electrical Installation: Bottom Cable Entry
Symmetra MW 800 kW 3 × 400/230 V Installation - 990-1510D 17
PE and AC cable connections (bottom cable entry)
Feed the AC and PE cables through the bottom of Input/Output Section.
Connect cables.
N
N
Protective Earthing Conductors
for Battery 1 & AC IN
Protective Earthing
Conductors for Battery 2 &
AC OUT
Battery 2
Battery 1
Output circuit
grounding bar
Earthing conductor
connected to suitable
earth electrode TN-
systems
Output circuit
grounding bar
PE
Bonding
Jumber (TN-
systems) to
Input Neutral
Bar
2.3 in / 58 mm
1.75 in /
44.45 mm
1.75 in /
44.45 mm