Installation
990-1401
Installation Guide APC BC300 Series 40kW 208/450/480V UPS 7
3.1.1 UPS Footprint (measurements in inches & mm)
Figure 1 - Footprint
3.2 Installing the Conduit Connection Kit
Insulated and other tools required
• 13 mm ratchet or wrench
• T20 torx screwdriver
• Greenly punch
• Equipment suitable for lifting heavy UPS off the ground
36.00 (914)
Minimum Service
Clearance
39.4
(1000)
31.7
(804)
59.1
(1500)
AA
Front View Side View
36.00 (914)
Recommended
Cooling
Clearance
31.7
(804)
Section A-A
View From Inside Cabinet, Looking Down
Conduit
Connection
Box
Cable Entry
(Rear)
(Front)
17.9
(455)
17.9
(455)
39.4
(1000)
19.8
(504)
27.9
(708)
31.7
(804)
Notes:
1. All dimensions are in inches (millimeters).
2. Minimum cooling and service clearance 36.00 (914).
3. Conduit entry is bottom of unit.
4. Unit weight = 1798lbs (815kg)
5. Installation must comply with all applicable national and local codes