5 Installation procedure
For installation purposes the PICO units are factory Pre-Set for 150 meters. If the Pico
link distance is less than 50 meters, the beam should be adjusted, with the special tool(see
below)
5.1 Installation of the link
For proper installation follow The Steps Listed Below.
1. Direct head “A” to side “B” using the embedded pointing device.(See Diagram
1.1) Align Cross-Hair at unit “B”
Diagram 5.1
2. Direct head “B” to side “A” using the embedded pointing device.(See Diagram
3.1) Align Cross-Hairs at unit “B”.
3. fix the pico head on side “A” and
on side “B” with the screws to the
mounting frame and with the
screws on the side of the
unit(make sure that the unit is not
moved during the tighten
process). The screws should be
sufficiently tight to hold the unit
for long time.
4. Power Pico units at both ends.