Completing the Installation
3-10 Installation
c. Verify that the 100BASE-TX device at the other end of the twisted pair segment is powered
up.
d. Check the cable for continuity.
e. If a link is not established, contact Cabletron Systems for technical support. Refer to
Section 1.2 for details.
5. Repeat steps 1 through 4 above, until all connections have been made.
3.5 COMPLETING THE INSTALLATION
After installing the 2H253-25R and any optional HSIM or VHSIM, and making the connections to
the network, proceed as follows:
1. Secure the cables by running the cables along the strain-relief bracket and tying them to the
strain-relief bracket using cable ties.
2. The 2H253-25R is now ready to be configured through Local Management. Refer to the
SmartSwitch Series 2E253, 2H252, 2H253, and 2H258 Local Management User’s Guide for
information on how to access and use Local Management.