Cabletron Systems ESX-1320 Switch User Manual


 
Chapter 3: Installation
3-18 ESX-1320/ESX-1380 Installation Guide
4. Designate the first workstation as a file server and the second one as
the client (refer to individual workstation manuals for instructions on
assigning server/client relationships).
5. Send packets between the two workstations to verify the proper
operation of the ESX.
If a failure occurs, contact Cabletron Systems Technical Support. Refer to
Chapter 1, Getting Help.
Figure 3-13 Pre-Installation Test
NOTE
Interface 13, the BRIM, requires additional network equipment
for proper testing.
1574-13
Move Between Ports
Client Workstation
7X 8X 9X 10X 11X 12X1X 2X 3X 4X 5X 6X
ESX-1320
COM 2 COM 1
DISPLAYRESET
MULTI PORT ETHERNET SWITCH
WITH
FDSE
AND
LANVIEW
®
RECEIVE
TRANSMIT
PORT
PWR
CPU
123456789101112
File Server Workstation