Cabletron Systems SEH-22 Switch User Manual


 
INSTALLING THE SEH
SEH USER’S GUIDE 3-7
To stack SEHs, refer to Figure 3-6 and perform the following steps:
1. Attach one end of the SEH HubSTACK Interconnect cable to the bus
port labeled “OUT” on the rear panel of the SEH.
2. Attach the other end of the SEH HubSTACK Interconnect cable to the
bus port labeled “IN” on the rear panel of the SEH next in the stack.
3. Attach up to four SEH hubs in the stack repeating steps 1 and 2.
Figure 3-6. Stacking the SEH
To attach an SEH to an SEHI, refer to Figure 3-6 and follow these steps:
1. Attach the SEHI HubSTACK Interconnect cable to the bus port
labeled “OUT” on the rear panel of the SEHI.
2. Attach the other end of SEHI HubSTACK Interconnect cable to the
bus port labeled “IN” on the rear panel of the SEH next in the stack.
1491_06
HubSTACK
10BASE-T HUB
WITH
LANVIEW®
SEH-24
OUT
IN
SEH INTERCONNECT
HubSTACK
10BASE-T HUB
WITH
LANVIEW®
SEH-24
OUT
IN
SEH INTERCONNECT
HubSTACK
10BASE-T HUB
WITH
LANVIEW®
SEH-24
OUT
IN
SEH INTERCONNECT
HubSTACK
10BASE-T HUB
WITH
LANVIEW®
SEH-24
OUT
IN
SEH INTERCONNECT
SEH INTERCONNECT OUT
HubSTACK
10BASE-T HUB
WITH
LANVIEW®
SEHI-24
HubSTACK
10BASE-T HUB
WITH
LANVIEW®
SEH-24
OUT
IN
SEH INTERCONNECT
HubSTACK
10BASE-T HUB
WITH
LANVIEW®
SEH-24
OUT
IN