![](http://pdfasset.owneriq.net/2/10/210df855-f6c1-430d-adc5-6352586ba690/210df855-f6c1-430d-adc5-6352586ba690-bg8.png)
8
Step 6 Insert the screws (from the mounting kit) through the AIM into the metal standoffs. (See Figure 8.)
Step 7 Check that the AIM is installed correctly on the system board. (See Figure 9.)
Figure 8 Connecting an AIM to the System Board
Figure 9 Installed AIM
72850
Front of system
board
Plastic standoff
AIM connector
Metal standoffs
AIM
72851