Power Switching CRESTRON GREEN LIGHT™
Installation
Observe the following when installing the cabinet:
• The cabinet must be mounted by a licensed electrician in accordance with all national and local codes.
Refer to the diagram below for specific requirements.
• The cabinet is designed for surface mounting on a wall.
• Cabinets are intended for indoor use only.
• The ambient temperature range should be 32°F to 104°F (0°C to 40°C). The relative humidity should range
from 10% to 90% (non-condensing). Allow adequate clearance in front of the cover for servicing.
Mounting Location
MAXIMUM HEIGHT OF
HIGHEST BREAKER
(FROM GROUND)
3'
(0.9 m)
6'-7"
(2.01 m)
MINIMUM REQUIRED
CLEARANCE
WALL
4 • CRESTRON GREEN LIGHT Power Switching Installation Guide – DOC. 6672B