Enterasys Networks B3G124-48P Switch User Manual


 
Considerations Prior to Installation
3-2 Hardware Installation
Considerations Prior to Installation
Wheninstallingtheswitch,notethefollowing:
•Beforestartingtheinstallationprocedure, notifythenetworkadministratorofthe
installation.
•Followtheinstallationproceduresintheorderaspresentedinthisguide.
•DonotconnecttheswitchtothenetworkuntilyouhaveestablishedthecorrectIP
address.
Required Tools
APhillipsscrewdriverisrequiredtoinstalltheswitchintoarack.
Unpacking the Switch
Unpacktheswitchas follows:
1. Opentheboxandremovethepackingmaterialprotectingtheswitch.
2. Verifythatthe contents ofthecartoncontainstheitemslistedinTable 31.
3. Removethetapeseal onthe nonconductivebagtoremovetheswitch.
4. Performavisualinspectionoftheswi tchforany
signsofphysicaldamage.Contact
Enterasys Networksifthereareanysignsofdamage.RefertoGettingHelpon
page xviiifordetails.
Table 3-1 Contents of Switch Carton
Item Quantity
B3G124-24Por B3G124-48P switch device 1
Rack mounting bracket 2
M3x6-mm flathead screws 8
Rubber feet with adhesive backing for installation on a flat surface 4
AC power cord (The type of power cord is country-dependent.) 1
This installation guide 1
Customer Release Notes 1
URL notice card 1