Extron electronic IPL T PCS4 Network Hardware User Manual


 
Scheduling power to receptacles
The Schedule screen on the Configuration tab lets you schedule when power to the
receptacles is turned on and off. You can schedule receptacles individually to turn on or
off at desired times, or you can select a group of receptacles to turn on or off at one time.
Clicking the Clear Schedule button deletes all schedules. You may want to set up your
schedule for a week at a time, or a day at a time.
To access the Schedule screen, click Schedule on the side-bar menu on the Configuration
screen.
Figure 20. Schedule Screen Showing Fields for Individual Receptacle Scheduling
Scheduling an individual receptacle
To schedule power on and off to an individual receptacle, follow these steps:
1. Locate the number of the receptacle that you want to schedule, and click On or Off in
the Power column beside it. A Set Schedule For section opens, displaying the selected
receptacle number, the power selection (On or Off), and menus from which to select
the hour, minute, and AM or PM. (Figure 20, above, shows the Schedule screen with a Set
Schedule For section displayed for receptacle 2, with power on at 1:00 pm Monday and
Thursday.)
2. From the pull-down menus, select the time (hour and minutes and AM or PM) at which
you want power turned on or off to the selected receptacle.
3. Select the check boxes for the days of the week you want the receptacle to be turned
on, off, or both at the time you specified.
4. When nished, click Set to save your settings for that receptacle.
5. Repeat steps 1 through 4 for the remaining power schedule setting for the receptacle
you just scheduled, or for other receptacles that you want to schedule.
IPL T PCS4 • HTML Configuration and Control 31