FARGO electronic II Printer User Manual


 
23
CAUTION!
!
C. Loading the
Overlaminate
into the Printer
The loading process for both the thermal transfer
film and the PolyGuard overlaminate material is
the same. Refer to the following steps to load either
type of overlaminate into the Printer.
DO NOT TOUCH THE METAL LAMINATION
SHIELD OR THE LAMINATION ROLLER WHEN
LOADING OVERLAMINATE. YOU WILL BURN
YOURSELF!
1. Remove the
overlaminate from its
packaging.
2. The supply end of
the overlaminate roll is
the side containing the
fresh, unused portion
of the overlaminate.
The take-up end is the
other side.
3. Open the top-left
cover of the printer by
pressing its Cover
Release Button. Allow
the cover to swing up
and open.
4. With the cover
open, place the supply
end of the
overlaminate roll in
between the two black
Lamination Drive
Hubs located just to the
left of the printerÕs
card flipping
mechanism. Make
certain that the
overlaminate material
is fed from underneath
the roll. (Hint: The
Lamination Drive Hub
nearest you, as you are
looking into the printer
from the front, is spring
loaded. Use the end of the
roll’s supply core to push
in this hub when
inserting the
overlaminate roll.)
Supply
Take-up
Card Flipping
Mechanism
Take-up
Lamination
Drive Hubs
Supply
Lamination
Drive Hubs