3–2 MULTILINK ML2400 ETHERNET COMMUNICATIONS SWITCH – INSTRUCTION MANUAL
INSTALLATION CHAPTER 3: INSTALLATION
Locate an power source within six feet (2 meters) of the intended ML2400 site. The rugged
metal case of the will normally protect the switch from accidental damage in a lab or
workplace setting. Maintain an open view of the front to visually monitor the status LEDs.