HP (Hewlett-Packard) 6400CL Switch User Manual


 
2-3
Installing the Switch
Installation Procedures
Installing the Switch
Installation Procedures
Summary
1. Prepare the installation site (page 2-5). Ensure the physical environ-
ment is properly prepared, including having the correct network cabling
ready to connect to the switch and having an appropriate location for the
switch. See page 2-4 for some installation precautions.
2. Install a cl module (optional—page 2-7).
3. Install a transceiver (optional—page 2-8). If you have installed a media
flex cl module, you can now install one or two transceivers.
4. Verify the switch passes self test (page 2-9). Plug the switch into a
power source and observe that the LEDs on the switch’s front panel
indicate correct switch operation. When self test is complete, unplug the
switch.
5. Mount the switch (page 2-11). The Switch can be mounted in a 19-inch
telco rack, in an equipment cabinet, or on a horizontal surface.
6. Connect power to the switch (page 2-13). Once the switch is mounted,
plug it into the nearby main power source.
7. Connect the network cables (page 2-14). Using the appropriate
network cables, connect the network devices to the switch ports.
8. Connect a Redundant Power Supply (RPS), (optionalpage 2-15).
You may wish to use the RPS option with your Switch. Connect the RPS
using the cables supplied with the RPS, to the back of the switch.
9. Connect a console to the switch (optionalpage 2-18). You may wish
to modify the switch’s configuration, for example, to configure an IP
address so it can be managed using a web browser, from an SNMP network
management station, or through a Telnet session. Configuration changes
can be made easily by using the included console cable to connect a PC
to the switch’s console port.
At this point, the switch is fully installed. See the rest of this chapter if you
need more detailed information on any of these installation steps.