Installation Instructions PRJ-WALLKIT-13
Visit the InFocus support site at www.infocus.com/support 5
Site Requirements
WARNING: IMPROPER INSTALLATION CAN LEAD TO EQUIPMENT FALLING CAUSING SERIOUS PERSONAL INJURY
OR DAMAGE TO EQUIPMENT! The figure below identifies the minimum requirements for installation of mount onto a steel stud
structure. If the structure or its components do not meet these requirements contact the mount manufacturer for specific
instructions before attempting installation. It should also be noted that no other equipment should be mounted to the same stud.
Drywall
**1/2" minimum
Drywall Thickness
Short Throw Mount Installation Location
FRONT
(Both Sides of Stud)
There must be a minimum of
1-7/8" (48mm) clearance
inside wall
16" (on center) Studs
If back side of wall is unfinished, drywall must be installed
to a minimum of one stud left and right of the studs
Steel Stud (2 x 4 / 25ga minimum)
Stud type and structural strength must conform to the North American
Specification for the Design of Cold-Formed Steel Structural Members.
**See hazard statement
on page 2!
[362, 125 18, C-Shape, S - Stud Section]
being used to install the mount. Drywall must be
secured to studs using screws spaced a maximum
of 10" apart along stud.
(Centered over two studs, or over
one stud)