EonStor A12U/A08U-G2421 Installation and Hardware Reference Manual
Figure 2-1: Installation Procedure Flowchart
2.5 Unpacking the Subsystem
Use the unpacking checklist in your package to check packing contents. Carefully
check the items contained in each box before proceeding with installation.
Each packed box is separated into the upper and lower levels.
Upper level: The boxes on the upper level contain:
• Eight (8) or twelve (12) drive canisters
• Accessory items
Lower level: The lower box should contain the enclosure chassis with all the pre-
installed components. The pre-installed components should include:
• RAID controller module
• PSU modules
• LCD panel
• Cooling fan modules
• A backplane
Accessory items are placed in a box on the upper level. They include two power
cords, a null modem, screws, an audio jack cable, a VHDCI-to-VHDCI external
SCSI round cable, a printed copy of Quick Installation Guide and an Unpacking
Checklist and a product utility CD containing the Installation and Hardware
Reference Manual (this document), Generic Operation (Firmware) Manual,
RAIDWatch GUI software and RAIDWatch User’s Manual.
Unpacking the Subs
y
stem
2-6