VANLINK SYSTEM GUIDE
VanLink System featuring TouchStar™ Technology - Troll Systems Corporation VanLink System Requirements
Document VLSG-01 - 10/21/08 2-1
SECTION 2
VANLINK SYSTEM REQUIREMENTS
2.1 INTRODUCTION
This section provides information detailing the system requirements and theory of
operation of the Vanlink Control System. The following topics are discussed:
• Safety Recommendations
• System Requirements
• Theory of operation and recommendations
2.2 SAFETY RECOMMENDATIONS
Equipment installation and operation should only be performed by qualified personnel
that are familiar with the type of equipment being installed.
The following guidelines will help ensure your safety and protect the equipment from
damage. However, these guidelines do not cover all potentially hazardous situations you
might encounter during system installation. Refer also to the Safety Considerations of
this guide for additional safety information.
• Always disconnect all power connections before installing or removing the Vanlink
System and its associated components (i.e. the V750 Master Controller).
• Keep the rack and/or installation area clear and free of dust during and after
installation.
• Keep tools and chassis components away from walk areas.
• Comply with all local safety laws and guidelines.
• Do not wear loose clothing, jewelry (including rings and chains), or other items that
could get caught in the equipment. Fasten or remove loose ties, scarves, sleeves,
and other items before you start installation procedures.
• Equipment grounding must meet local and national electrical codes.