Kyocera VLSG-01 Network Router User Manual


 
INSTALLATION REQUIREMENTS
VanLink System featuring TouchStar™ Technology - Troll Systems Corporation VanLink System Requirements
Document VLSG-01 - 10/21/08 2-3
2.3.3.1 Running Cables
Cables should only be installed by qualified personnel who are familiar with the electrical
requirements and safety precautions that are necessary to properly and safely install
(run) these items.
The cables should be inspected prior to installation. Connectors should be visually
inspected prior to connecting to their mating connector.
2.3.3.2 V750 Cable and Connector Requirements
The V750 cable and connector requirements are as follows:
Cabling consisting of four (4) wires will be required between the V750 and the
pan/tilt for azimuth and elevation feedback.
Some pan/tilts may already have the potentiometers installed in which case the
wires needed may already be terminated and run through the NYCOIL.
The harness for the GPS/IMU can be extended to reach the roof of the vehicle if
necessary.
Refer to Figure 2–1
p/n
TBD
Figure 2–1. Cable Connector/Adapters E-201-0101-01