MGE UPS Systems EX 11RT Power Supply User Manual


 
Setup and Installation
2.0 Scope
Installation guides the user through tools and equipment required for making input/output power and communica-
tion cable connections, and battery installation and replacement. It provides assembly instructions, power cable
connections with wire diagrams for configuring the product to hardware specifications.
2.1 Unpacking and Parts Check
Once the EX 5/7/11RT system has been inspected and received from the shipping courier, the unit should be moved
to a position as close to the final installation location as possible. See Figures 2-1on page 2-3.
All Modules are shipped in separate boxes.
Prior to any installation, the following items should be observed upon receipt of the EX 5/7/11 RT.
1. Inspect shipment for any damage prior to receipt. Damage claims should be filed directly with the courier.
Replacements for damaged components should be ordered through MGE Customer Support Services at
1-800-438-7373.
2. Remove wrapping and foam corners to verify that the equipment nameplate (located on the rear of the units)
details a system that corresponds with the equipment ordered.
2 — 186-86000-00 A01 Installation