Setup and Installation
2.0 Scope
Setup and Installation guides the User through tools and equipment required for making hardwire connections.
Included are power cable connections with wire diagrams for configuring the product to specifications, and
obtaining MGE field service assistance for final installation and startup.
Final installation and start-up should be completed and performed by a qualified MGE Field Service
Engineer.
CAUTION Scheduling of the MGE Field Service Engineers typically should be
done 7 to 10 days before they are required on-site. If the startup of
the UPS is critical to maintaining your schedule, please call the
MGE toll free telephone number at
1-800-438-7373 for assistance.
To insure a successful installation, each of these (5) steps should be followed in their correct sequence.
Note that any unauthorized installation may cause damage to the UPS(s) and void the MGE warranty.
First steps by an on-site qualified Technical Engineer
Step 1. Unpack and position the unit
Step 2. Connect the main (utility) power
Step 3. Connect the output to the power distribution panel
Step 4. The MGE Field Service Engineer finalizes installation and the startup process.
Optional: Procedure for temporary power prior to the final startup.
Required Equipment and Tools
The following equipment and tools are recommended for on-site installation:
◗ Digital volt meter (DVM)
◗ 1/8 inch slotted screwdriver
◗ Pallet jack/forklift
◗ Conduit installation tools
◗ Nut driver set
2 — 186-504004-00 B03 Installation